Application of Building Information Modeling Tool for Building Project
Amol A. Metkari, Dr. A. C. Attar
Abstract: Building Information Modeling (BIM) is a smart technological tool that allows a project to be built virtually before being built physically. It creates and uses consistent, coordinated, computable information about a building project. This dependable digital information about a building can be used for production of high-quality construction documents, design decision-making, cost-estimating, performance predictions, construction planning and eventually for managing and operating the facility. The purpose of this paper was to see the impact of BIM implementation on the traditional convent ional bu ilding design methods. The BIM is extends this methodology into three dimensional (3D) drawings in the three primary dimensional width, height and depth with the time as the fourth dimension (4D) and cost as the fifth (5D).4D model based scheduling simulation can be used to monitor the progress at site without being actually present there. It can also help in monitoring delays in relation to a planned schedule.5D model based estimating produces accurate quantities for the efficient estimation of architectural, structural and services components. These quantities can be extracted at various stages at concepts stage for generating budgets, at the end of design development stage for floating tenders, at GFC stage for verifying contractor bills. The BIM tools is to be helps for design, defining the building form and spaces, visualization to analyzing costs, time and energy performance. It is a construction management (CM) tool useful for a real simulation process of the ongoi ng build ing project. In the undertaken case study, BIM is useful for increasing total project quality, providing accurate quantity take-offs, improving scheduling timetables, consequently diminishing total project contingencies and costs. The case study presented in this paper suggested contractual arrangement for the building project resulted in improved productivity, better coordination, reduced error and rework of construction.
Keywords: Building Information Modeling, Construction Management, Global Financial Crisis, 4D Model, 5D Model, Visualisation, Simulation
Edition: Volume 4 Issue 5, May 2015
Pages: 324 - 329
Make Sure to Disable the Pop-Up Blocker of Web Browser
Similar Articles
Downloads: 3 | Weekly Hits: ⮙1 | Monthly Hits: ⮙1
Review Papers, Civil Engineering, India, Volume 12 Issue 1, January 2023
Pages: 885 - 888A Review on Artificial Intelligence and its Effect on Human Nature in Construction Industry
Mohammed Ziauddin
Downloads: 121
Research Paper, Civil Engineering, India, Volume 6 Issue 3, March 2017
Pages: 1313 - 1316Effect of Work Environment on Productivity in Construction Management
ArathyA S, MobinRaj T
Downloads: 144 | Weekly Hits: ⮙1 | Monthly Hits: ⮙1
Research Paper, Civil Engineering, Iraq, Volume 6 Issue 7, July 2017
Pages: 2258 - 2265Assessing BIM Integration with Sustainable Requirement for Buildings Construction
Ahmed Mahjoob, Mohammed Mahdi Abed
Downloads: 146 | Weekly Hits: ⮙1 | Monthly Hits: ⮙1
M.Tech / M.E / PhD Thesis, Civil Engineering, India, Volume 5 Issue 4, April 2016
Pages: 1231 - 1237Concept of Value Engineering in Construction Industry
Khaled Ali Alabd Ahmed, R. K. Pandey
Downloads: 158
M.Tech / M.E / PhD Thesis, Civil Engineering, India, Volume 7 Issue 4, April 2018
Pages: 215 - 216Decision Making in Contractor Selection: AHP and Expert Choice Approach
Najla.M, Shajina