International Journal of Science and Research (IJSR)

International Journal of Science and Research (IJSR)
Call for Papers | Fully Refereed | Open Access | Double Blind Peer Reviewed

ISSN: 2319-7064


Downloads: 135 | Views: 315 | Monthly Hits: ⮙1

Research Paper | Management | Kenya | Volume 8 Issue 5, May 2019 | Popularity: 6.9 / 10


     

Stakeholder Management and Execution of Fibre Optic Infrastructure in Nairobi County, Kenya

James Konya Akhwaba, Omondi Bowa, Peter Keiyoro


Abstract: The main purpose of this study was to investigate the extent to which stakeholder management influences execution of fibre optic infrastructure implemented by mobile telecommunication and internet service providers in Nairobi County, Kenya. The objective of the study was to assess the extent to which stakeholder management influences execution of fibre optic infrastructure. The research design that guided this study was cross-sectional survey. The study adopted mixed methods research and pragmatism paradigm approach. A self-administered structured questionnaire was used to collect quantitative data while an interview guide and document review guide were used to collect qualitative data. Prior to data collection, preliminary testing of research instruments was done using content analysis and test retest principle to ascertain validity and reliability respectively. Census was used to select 187 respondents from a target population of 187 functional staff in fibre optic infrastructure departments of two mobile telecommunication and four internet service companies through stratified and purposive sampling. The study used summary statistics to analyze descriptive data. Inferential statistical analysis were performed using simple regression and hypotheses tested for significance using F tests. To ensure validity of statistical investigation, tests of statistical assumptions were done prior to data analysis. The null hypothesis, which stated that Stakeholder management does not significantly influence execution of fibre optic infrastructure (H01), was rejected and conclusion made that stakeholder management has a significant positive influence on execution of fibre optic infrastructure with R2 = 0466, = 0.600, p-value = 0.000 < 0.05. It was recommended that telecommunication and internet service companies should ensure that stakeholders are involved in all the phases of a project from inception to closure. The study also recommended that companies should make use of conflict management and communication skills to ensure change is managed well. This study was delimited to consider the extent to which stakeholder management influences execution of fibre optic infrastructure in Nairobi County, Kenya. It was therefore suggested that more studies should be conducted on other factors that may influence execution of fibre optic infrastructure in Kenya


Keywords: Stakeholder Management, Execution of Fibre Optic Infrastructure


Edition: Volume 8 Issue 5, May 2019


Pages: 1855 - 1860



Make Sure to Disable the Pop-Up Blocker of Web Browser


Text copied to Clipboard!
James Konya Akhwaba, Omondi Bowa, Peter Keiyoro, "Stakeholder Management and Execution of Fibre Optic Infrastructure in Nairobi County, Kenya", International Journal of Science and Research (IJSR), Volume 8 Issue 5, May 2019, pp. 1855-1860, https://www.ijsr.net/getabstract.php?paperid=ART20198087

Similar Articles

Downloads: 159 | Weekly Hits: ⮙2 | Monthly Hits: ⮙3

Research Paper, Management, Sierra Leone, Volume 9 Issue 2, February 2020

Pages: 973 - 978

The Essence of Risk Identification in Project Risk Management: An Overview

Crispin George

Share this Article

Downloads: 152 | Weekly Hits: ⮙1 | Monthly Hits: ⮙2

Research Paper, Management, India, Volume 6 Issue 7, July 2017

Pages: 163 - 167

Managing Cost Uncertainty in Production Using Genetic Algorithm

Dr. Niju. P. Joseph, Redha Jasim Shaker

Share this Article

Downloads: 138 | Weekly Hits: ⮙1 | Monthly Hits: ⮙1

Research Paper, Management, India, Volume 5 Issue 10, October 2016

Pages: 11 - 15

Demand Management by Auto Component Manufacturers - A Study of Strategies

Dr. Gopaldas Pawan Kumar

Share this Article

Downloads: 167 | Weekly Hits: ⮙1 | Monthly Hits: ⮙1

Research Paper, Management, India, Volume 7 Issue 6, June 2018

Pages: 958 - 964

A Comparison between Engineering and Arts Faculty in Knowledge Sharing

J Antonette Asumptha, M Punniyamoorthy, Collin Joseph Xavier M

Share this Article

Downloads: 139

Informative Article, Management, India, Volume 5 Issue 1, January 2016

Pages: 731 - 733

Plan and Conduct a Nursing Staff Development Programme

Ajithakumari.G, V. Hemavathy

Share this Article
Top