M.Tech / M.E / PhD Thesis | Civil Engineering | India | Volume 8 Issue 3, March 2019


Application of Six Sigma Concept to Optimize the Time and Quality of Construction Industry in Nepal

Alex Singh Thagunna | S. Priscil Nidhu [2]


Abstract: The world has taken the word construction as nation developing phenomena. The countrys economic and social development depends upon its rate of productive construction. The productivity is acquired if time and quality of construction has taken into consideration. There were various methods of increasing the construction productivity such as Project Management Technique-Critical Path Method, Program Evaluation and Review Technique etc. These techniques some-how increased the construction efficiency but it didnt obtain the required expectation. Thus, Six-Sigma- as a philosophy, which was considered in this paper. The five phases of Six-Sigma will provide the systematic way to increase the efficiency. Define (D), Measure (M), Analyze (A), Improve (I) and Control (C) are the five phases of Six Sigma. The paper is based on two work portions, one with questionnaire and other is practical use of Six Sigma in construction industry. The questionnaire was sent to 100 individuals out of which only 60 questionnaires were retrieved. The obtained questionnaire was evaluated with the RII (Relative Importance Index) method. The case study in which six-sigma was used is of internal tiling work for a residential building. The flat was of 2BHK and 2 numbers of flat were observed. The initial tiling work was evaluated without any direction and the sigma level was 2.08. After applying the Six Sigma Concept, the obtained level was 3.7. Hence, this research paper demonstrate that Six-Sigma is able to optimize and improve time and quality of construction projects.


Keywords: Six-Sigma, Delay, Quality, Factors, Sigma level, Construction


Edition: Volume 8 Issue 3, March 2019,


Pages: 1447 - 1450


How to Download this Article?

You Need to Register Your Email Address Before You Can Download the Article PDF


How to Cite this Article?

Alex Singh Thagunna, S. Priscil Nidhu, "Application of Six Sigma Concept to Optimize the Time and Quality of Construction Industry in Nepal", International Journal of Science and Research (IJSR), Volume 8 Issue 3, March 2019, pp. 1447-1450, https://www.ijsr.net/get_abstract.php?paper_id=ART20196228

Similar Articles with Keyword 'Delay'

Downloads: 1 | Weekly Hits: ⮙1 | Monthly Hits: ⮙1

Analysis Study Research Paper, Civil Engineering, Libya, Volume 12 Issue 8, August 2023

Pages: 1114 - 1120

Evaluation of Construction Efficiency in the Implementation of the Construction Project in Libya

Fathi Elharare Elhaniash [2]

Share this Article

Downloads: 101

Case Studies, Civil Engineering, India, Volume 4 Issue 12, December 2015

Pages: 2069 - 2070

ISKON Rotary Intersection on S.G Highway in Ahmedabad as Signalized Intersection - A Case Study

Alpana Jha [3]

Share this Article
Top