International Journal of Science and Research (IJSR)

International Journal of Science and Research (IJSR)
Call for Papers | Fully Refereed | Open Access | Double Blind Peer Reviewed

ISSN: 2319-7064


Downloads: 139

Case Studies | Production Engineering | India | Volume 7 Issue 5, May 2018


Improvement in Productivity of Leaf Spring Manufacturing Through Value Stream Mapping: A Case Study

Ghanshyam Sharma | Sanjay Goyal [2]


Abstract: Value stream mapping is a tool that includes all the phases of production line which is used to transform the raw material or unfinished goods into the desired finished product. A value stream observed all the activities through which the material gets transformed into the product. Value stream mapping use to provide the visual representation of every process that is related to existing material and information flow. A current state map of value stream helps us to identify the areas of waste and pinned them to improve, all the activity those are non value adding are also scrutinize by value stream. By making the modification in current material and information flow of existing plant a Future state map to be drawn. This map represents the improvement in selected family of product that is scrutinized in current state. In todays competitive era it is essential to every company that follow a path which derived the organization to forward than others. This will only make by the reducing the lead time, product cost, reducing non value added activities in plant these factor affect the overall production most significantly. The value stream mapping is tools that pay the attention to above cited factors. In this paper we opt the value stream mapping technique to eliminate the wastages, subjected to different process in leaf spring manufacturing plant. A CSM (current state map) represents the existing methods of doing and opportunities of improvement. Future state map represent the modification in process and overall reduction in production cost. Cost of leaf production decrease from 96.5lac to 96.1lac.


Keywords: VSM Value stream mapping, lead time, non value adding activities, FSM future state map, CSM current state map


Edition: Volume 7 Issue 5, May 2018,


Pages: 844 - 847


How to Download this Article?

You Need to Register Your Email Address Before You Can Download the Article PDF


How to Cite this Article?

Ghanshyam Sharma, Sanjay Goyal, "Improvement in Productivity of Leaf Spring Manufacturing Through Value Stream Mapping: A Case Study", International Journal of Science and Research (IJSR), Volume 7 Issue 5, May 2018, pp. 844-847, https://www.ijsr.net/get_abstract.php?paper_id=ART20182559

Similar Articles with Keyword 'Value'

Downloads: 4 | Weekly Hits: ⮙1 | Monthly Hits: ⮙1

Review Papers, Production Engineering, India, Volume 11 Issue 4, April 2022

Pages: 1080 - 1083

Review on Applications of Fluid in Rocket Science (Fuel)

Singye Wangchuk

Share this Article

Downloads: 92

M.Tech / M.E / PhD Thesis, Production Engineering, India, Volume 3 Issue 7, July 2014

Pages: 808 - 812

Comparison of Three Remedial Alternative Solutions' and Selection of Best for Alternative Design of Pressure Board UVSL

Kapil Deshmukh | Dr. S. P. Untawale

Share this Article
Top