Value Stream Mapping to Improve Value Ratio of Subcontracting Process in a Pressure Vessel Manufacturing Facility (A Case Study)
International Journal of Science and Research (IJSR)

International Journal of Science and Research (IJSR)
Call for Papers | Fully Refereed | Open Access | Double Blind Peer Reviewed

ISSN: 2319-7064


Downloads: 109 | Views: 402

Case Studies | Industrial Engineering | India | Volume 4 Issue 9, September 2015 | Popularity: 6.1 / 10


     

Value Stream Mapping to Improve Value Ratio of Subcontracting Process in a Pressure Vessel Manufacturing Facility (A Case Study)

Vignesh Ravichandran


Abstract: This paper is based on a case study in a pressure vessel manufacturing facility. The facility manufactures air receivers and air-oil separators. The facility subcontracts rolling of shells and forming of dishes. The plant suffers from poor value added ratio. This issue has been addressed with the help of value stream mapping. Current and future state maps have been drawn to improve the value ratio substantially. After implementing the proposed solutions, the value ratio has improved by 100 % for shells and 67 % for dishes.


Keywords: inventory, inventory turnover, value stream mapping, inventory replenishment, sub-contracting


Edition: Volume 4 Issue 9, September 2015


Pages: 1132 - 1135



Please Disable the Pop-Up Blocker of Web Browser

Verification Code will appear in 2 Seconds ... Wait





Text copied to Clipboard!
Vignesh Ravichandran, "Value Stream Mapping to Improve Value Ratio of Subcontracting Process in a Pressure Vessel Manufacturing Facility (A Case Study)", International Journal of Science and Research (IJSR), Volume 4 Issue 9, September 2015, pp. 1132-1135, https://www.ijsr.net/getabstract.php?paperid=SUB158287, DOI: https://www.doi.org/10.21275/SUB158287

Top