International Journal of Science and Research (IJSR)

International Journal of Science and Research (IJSR)
Call for Papers | Fully Refereed | Open Access | Double Blind Peer Reviewed

ISSN: 2319-7064


Downloads: 130 | Views: 208

Research Paper | Civil Engineering | India | Volume 4 Issue 6, June 2015


Construction Equipment Fleet Management: Case Study of Highway Construction Project

Saurabh Rajendra Kadam | Prof. Dhananjay S Patil


Abstract: -Large number of construction equipment are required on construction site. The efforts of contractors are to constantly push machine capabilities forward. As the array of useful equipment expand, the importance of careful planning and execution of construction equipments increases. The objective of the project is to predict the fleet production rate and to optimize the number and size of equipments in the fleet to match the equipment to project situations. Equipment economics is taken into consideration for the optimization.


Keywords: Productivity Analysis, Optimization, Ownership and Operating Cost


Edition: Volume 4 Issue 6, June 2015,


Pages: 2558 - 2564


How to Download this Article?

Type Your Valid Email Address below to Receive the Article PDF Link


Verification Code will appear in 2 Seconds ... Wait

Top