International Journal of Science and Research (IJSR)

International Journal of Science and Research (IJSR)
Call for Papers | Fully Refereed | Open Access | Double Blind Peer Reviewed

ISSN: 2319-7064


Downloads: 0 | Views: 69

Research Paper | Civil Engineering | Nigeria | Volume 12 Issue 10, October 2023


Performance Enhancement of Water Supply Distribution in Ogbomoso Metropolis

Adeyokunnu A. T. | Olaniyan O. S. [3] | Oyeleye A. D.


Abstract: The study assesses the performance, effectiveness and efficiency of the entire water supply distribution schemes in Ogbomoso North and South. The specific objectives are to assess the existing water supply distribution in Ogbomoso Township, also to carry out diagnostic assessment of the entire water distribution network, so as to evaluate the problems in the entire network. Data were collected through personal interview and observation both for the water corporation and the community supplied. A total of 200 structure questionnaires were administered to the supplied community, it was further analyzed using descriptive statistics. The study revealed that (50.5%) of the community still depended on well and borehole despite being supplied water from the scheme most especially community far away from the water scheme. Also it was gathered that there wasn?t any functional booster station. In addition, feedback from the SPEM showed that the water cooperation has a (44%) operational capacity and (30%) human capacity which is below average, though the SERA showed there were well defined policies and procedures while other evaluation such as organization structure, inventory control and equipment management, work order system are below average. The result shows that the Water supply distribution scheme could not meet the demand of the population in the area. The study therefore recommends the water board should look into alternative source of power which has being the main source of inconsistency in water supply, proper monitoring of the whole board for credibility and accountability and Proper funding of staff to encourage young learned personnel have interest in working in the water board.


Keywords: Performance Enhancement, Water Supply, Well, Borehole and Operational Capacity


Edition: Volume 12 Issue 10, October 2023,


Pages: 1258 - 1261


How to Download this Article?

Type Your Valid Email Address below to Receive the Article PDF Link


Verification Code will appear in 2 Seconds ... Wait

Top