International Journal of Science and Research (IJSR)

International Journal of Science and Research (IJSR)
Call for Papers | Fully Refereed | Open Access | Double Blind Peer Reviewed

ISSN: 2319-7064


Downloads: 1 | Views: 110

Masters Thesis | Civil Engineering | Indonesia | Volume 10 Issue 9, September 2021


Construction Value Engineering Construction of Serang - Panimbang Toll Road Section 3, Cileles - Panimbang Sta.50+677 - Sta.83+677 Banten Province

Okto Ferry Silitonga | Dr. Ir. Dwi Dina Riana [2] | Dr. Ir. Hari Nugraha Nurjaman [4]


Abstract: The cost for the construction of a project is very important but if there is no control in its use, the project owner's finances will lose. OnSerang ? Panimbang Toll Road Construction Project, Section 3 (Cileles ? Panimbang), Sta.50+667 ? Sta.83+677 Work Section 10 (Concrete Structure), Work Section 4 (Road Earthwork), Work Section 9 (Pavement) and Work Section 12 (Miscellanoues) cost more than other works. Value engineering is one way to reduce the cost factor because it will identify what work items may cost a lot by going through the information stage, creative stage, analysis stage, and recommendation stage and using the Paired Comparison method in determining the factors that will be used as design. his replacement.


Keywords: Cost Model, Cost Breakdown, Functional Analysis, Creative and Innovation, LCC, IRR


Edition: Volume 10 Issue 9, September 2021,


Pages: 907 - 917


How to Download this Article?

Type Your Valid Email Address below to Receive the Article PDF Link


Verification Code will appear in 2 Seconds ... Wait

Top