Downloads: 11
United Arab Emirates | Electrical Power Engineering | Volume 10 Issue 6, June 2021 | Pages: 1090 - 1093
Non-Disruptive Road Crossing Methods used by DEWA for High Voltage Cables Laying in Transmission Power Projects
Abstract: Non-Disruptive Road Crossings are of the project is to enhance the management, planning, design, construction, maintenance, and operation of all roads and related infrastructures to ensure a safe and uniform operational and structural capacity throughout the road network in Dubai. NDRC techniques that can be that ensure that the roads are not destroyed for the crossing of major waterways to a technique that can be employed in very congested utility corridors along busy highway systems as well as over longer distances employed in laying down underground crossings of Transmission Power Lines in Dubai Power Network. It reduces or eliminates damage often caused by conventional open-cut trenching methods, in turn reducing the costs.
Keywords: NDRC, HDD, DEWA
Rating submitted successfully!
Received Comments
No approved comments available.