Algorithm for CPM Computations with Single Mode Activities
Kuldeep Singh Kushwah [2] | Sanjay Tiwari [3]
Abstract: CPM is still the most popular network technique for construction projects. However CPM is very limited in scope when project deadline is restricted. This is because in conventional CPM each activity is assumed to have one fixed duration and corresponding normal cost. Thus the Project duration is fixed and project Manager do not have any control if the project is required to be completed within an earlier deadline as compared to project duration. The project duration is computed by summing the durations of only those activities that lie along the critical path. The project cost is the sum of cost of all activities of project. Hence Time cost trade-off technique is to be applied to CPM to overcome above restriction. For this CPM computations needs to be formulated. The paper presents an algorithm for CPM computations with single mode activities i. e. when each activity is assumed to have a fixed duration and cost.
Keywords: CPM
Edition: Volume 4 Issue 8, August 2015,
Pages: 879 - 882
Similar Articles with Keyword 'CPM'
Downloads: 7 | Weekly Hits: ⮙2 | Monthly Hits: ⮙2
Case Studies, Civil Engineering, India, Volume 11 Issue 4, April 2022
Pages: 1187 - 1197A Case Study on Planning and Scheduling of a Project PIPLMC of a Package - 6A using Microsoft Project 2016
Downloads: 120
M.Tech / M.E / PhD Thesis, Civil Engineering, India, Volume 4 Issue 8, August 2015
Pages: 876 - 878All Path Algorithm for CPM Networks
Kuldeep Singh Kushwah [2] | Sanjay Tiwari [3]