Masters Thesis | Construction Management | Indonesia | Volume 9 Issue 12, December 2020


Risk Factor Analysis of Planning Stage of Lumpsum Hydropower EPC Project Impacted to Quality and Time Performance

Arwan Kahfi | Bambang Purwoko Kusumo Bintoro | Rosalendro Eddy Nugroho


Abstract: The hydropower EPC project as a large complex project with various types of buildings carries risks that can cause failure or decrease in construction performance, especially quality performance and time schedule performance. EPC contracts with lump sum or fixed costs, where detailed planning is carried out after signing the contract in which one package with construction, then the planning stage has risk factors that affect the quality performance and time performance. A combination of quantitative and qualitative analysis is used as a research approach. Consultation and initial confirmation carried out for determining relevant risk factors to be studied and analyzed in the research model hypothesis using Structural Equation Model (SEM) with Smart-PLS software as a quantitative approach. The research model and risk response input from experts as a qualitative approach. The initial confirmation from the expert, it is known that 6 of the 8 initial variables with 36 out of 45 indicators are considered relevant for carried a hypothetical analysis of risk factors in the planning stage that affect the quality and time performance of the project. It's known that the variables of owner's necessities and requests, the scope of work and the engineering design output have a significant direct effect on quality and time performance. The communication and coordination factors have a significant effect on quality and time performance with the mediation of the engineering design output factors.


Keywords: EPC of hydropower, risk factors, planning stage, quality performance, time performance


Edition: Volume 9 Issue 12, December 2020,


Pages: 249 - 257


How to Download this Article?

You Need to Register Your Email Address Before You Can Download the Article PDF


How to Cite this Article?

Arwan Kahfi, Bambang Purwoko Kusumo Bintoro, Rosalendro Eddy Nugroho, "Risk Factor Analysis of Planning Stage of Lumpsum Hydropower EPC Project Impacted to Quality and Time Performance", International Journal of Science and Research (IJSR), Volume 9 Issue 12, December 2020, pp. 249-257, https://www.ijsr.net/get_abstract.php?paper_id=SR201126170057

Similar Articles with Keyword 'risk'

Downloads: 2 | Weekly Hits: ⮙1 | Monthly Hits: ⮙1

Research Paper, Construction Management, India, Volume 10 Issue 11, November 2021

Pages: 1163 - 1167

Construction Industry Tomorrow: Post COVID - Implementations on Project Management Factors and Strategies

AR. Shilpa Muralidhar | AR. Salil Dogra | AR. Garima Singh

Share this Article

Downloads: 2 | Weekly Hits: ⮙2 | Monthly Hits: ⮙2

Research Paper, Construction Management, India, Volume 12 Issue 9, September 2023

Pages: 1736 - 1738

Analysis and Evaluation of (β) Beta Distribution or Three Point Estimation for PERT Technique in Project Management

Ahraz Javeed Reshi

Share this Article
Top