Downloads: 125
Research Paper | Mechanical Engineering | India | Volume 5 Issue 6, June 2016
Genetic Algorithm for Resource Constrained Project Scheduling
Vinayak C. Sawant
Abstract: Resource Constrained Project Scheduling (RCPS) can be defined as the project scheduling with limited availability of resources to achieve goals such as minimization of makespan and maximization of Net Present Value (NPV). In this paper we have used Genetic algorithm (GA) to solve RCPS problem to minimize the makespan. By modifying the classical approach using GA, we solved the standard scheduling problems available and compared the results to previous researchers result and it shows that algorithm gives the optimal schedules and can be used for variable conditions of the resource usage in the problem.
Keywords: Resource Constrained Project Scheduling Problem RCPSP, Genetic Algorithm GA, Optimal Schedules
Edition: Volume 5 Issue 6, June 2016,
Pages: 139 - 146
Similar Articles with Keyword 'Resource'
Downloads: 0
Subjective Paper, Mechanical Engineering, India, Volume 11 Issue 6, June 2022
Pages: 1796 - 1801Strategies for Enhancing Productivity and Quality in Industries
B. V. S. Rao | Dr. P. Prabhakar Reddy | M. Bharath Kumar
Downloads: 0
Research Paper, Mechanical Engineering, Hungary, Volume 12 Issue 12, December 2023
Pages: 551 - 554VOC Vapour Recovery Controls and Technology
Andras Zsombok [2] | Imre Zsombok [2]