M.Tech / M.E / PhD Thesis | Civil Engineering | India | Volume 5 Issue 1, January 2016


Causes of Delays in any Construction Project

Naikwadi Sumaiyya R. [2] | Khare Pranay R. [2]


Abstract: Construction industry is one of fast growing industry all over the world Delays are one of the biggest problem in construction project. Construction delays can be identified as late completion of construction project. Delays can be minimized only when their causes are indentified. The objective of this paper is to study causes of construction delays, effects of delays and methods of minimizing construction delays. Project delay basis of Past literature review. There are many factors induced in delay of project some of factors identified as lack of funds, changes in drawing, lack of effective communication, poor project management. It is therefore recommended that adequate construction budget, timely issuing drawings and information, good project management skills should be main focus of project procurement process.


Keywords: causes of delays, effects of delays, construction project, project management


Edition: Volume 5 Issue 1, January 2016,


Pages: 59 - 61


How to Download this Article?

You Need to Register Your Email Address Before You Can Download the Article PDF


How to Cite this Article?

Naikwadi Sumaiyya R., Khare Pranay R., "Causes of Delays in any Construction Project", International Journal of Science and Research (IJSR), Volume 5 Issue 1, January 2016, pp. 59-61, https://www.ijsr.net/get_abstract.php?paper_id=NOV152573

Similar Articles with Keyword 'construction project'

Downloads: 0

Research Paper, Civil Engineering, Egypt, Volume 11 Issue 12, December 2022

Pages: 848 - 853

Hybrid Model for Predicting the Productivity of Concrete Batching Plants

Rana Roshdi Ibrahim | Aly Sherif Abdel Fayad | Mohamed Badawy

Share this Article

Downloads: 1

Masters Thesis, Civil Engineering, Indonesia, Volume 10 Issue 9, September 2021

Pages: 907 - 917

Construction Value Engineering Construction of Serang - Panimbang Toll Road Section 3, Cileles - Panimbang Sta.50+677 - Sta.83+677 Banten Province

Okto Ferry Silitonga | Dr. Ir. Dwi Dina Riana [2] | Dr. Ir. Hari Nugraha Nurjaman [4]

Share this Article
Top