Concrete In Hot Weather Conditions-Challanges - Precautions

Dr. S. Vijaya Mohan Rao [2]


Abstract: In general, Concrete sets as the cement hydrates, and is an exothermic reaction, means it generates heat reaction goes quickly when the concrete is hot condition. The main reason with the concrete's strength and setting time is not really the air temperature but the concrete temperature. During the time of cement hydration it sucks up water and forms crystals around the aggregate particles as shown in fig 1. The crystals grow faster but do not have time to grow strong when it is hot and is rapid. The 28-day strength suffers even though early strength is higher. If the concrete is about 16? hotter than normal (for example, 86? instead of 70?), the compressive strength will be about 10% lower. The slump decreases rapidly as the cement set up In hot weather, and the mixing water is more needed. It can also contribute to lower strengths ( another 10% lower), can lead to variations in water content which can result differences in concrete color between adjacent pours. Next problem in hot weather is drying of surface, comes with a caveat. If the concrete is warm, sun is shining and hot dry wind across the concrete, it is likely to get more drying and surface shrinkage. By the help of nomograph from ACI 305 (Fig 8) the relative humidity, concrete temperature, air temperature and wind velocity, it arrive at rate of evaporation. The shrinkage cracking is possible when the rate is greater than 0.1 pounds per square foot per hour. Hot dry sub grades and formwork can also result in cracks by absorbing water from the mix. Another problem with heat and concrete is thermal differentials. All that means is that one part of the concrete mass is warmer than another part. If the differential is greater than about 20?F then the concrete likely to get cracks. This tends to be a particular problem in mass concrete (members thicker than about 18 inches).


Keywords: Bleeding, Curing, Evaporation, Finishing, Mixture Proportioning, Plastic Shrinkage Cracking, Trial Batch, Temperature


Edition: Volume 5 Issue 1, January 2016,


Pages: 18 - 23


How to Download this Article?

You Need to Register Your Email Address Before You Can Download the Article PDF


How to Cite this Article?

Dr. S. Vijaya Mohan Rao, "Concrete In Hot Weather Conditions-Challanges - Precautions", International Journal of Science and Research (IJSR), Volume 5 Issue 1, January 2016, pp. 18-23, https://www.ijsr.net/get_abstract.php?paper_id=NOV152556

Similar Articles with Keyword 'Curing'

Downloads: 1 | Weekly Hits: ⮙1 | Monthly Hits: ⮙1

Research Paper, Civil Engineering, India, Volume 11 Issue 3, March 2022

Pages: 1509 - 1512

Preliminary Study of Development of Light Weight Concrete Blocks using Rice Husk Ash

Lalith Kumar | Manpreet Saini

Share this Article

Downloads: 1 | Weekly Hits: ⮙1 | Monthly Hits: ⮙1

Comparative Studies, Civil Engineering, Kenya, Volume 12 Issue 4, April 2023

Pages: 1647 - 1651

Using Wood-Ash in Cement Stabilization of Highly Expansive Soils for High-Rise Building Construction

Joel Kimarai

Share this Article
Top