International Journal of Science and Research (IJSR)

International Journal of Science and Research (IJSR)
Call for Papers | Fully Refereed | Open Access | Double Blind Peer Reviewed

ISSN: 2319-7064


Downloads: 145

M.Tech / M.E / PhD Thesis | Civil Engineering | India | Volume 7 Issue 4, April 2018


Study of Safety Management in Construction Industry

Shamna P [2] | Fazil P [4]


Abstract: Providing safe workplace conditions is one of the main purposes of a safety management system (SMS) in effective construction companies. The current study aims to establish a method for identifying and evaluating the factors that impact workplace safety conditions at construction sites. The fuzzy analytical hierarchy process (AHP) technique was used to determine and measure the qualitative factor weights affecting workplace safety to assist in the evaluation of multiple concurrent criteria. Hence, the fuzzy AHP technique was used to determine criterion weight. Alternatively, a fuzzy technique for Order Performance by Similarity to Ideal Solution (TOPSIS) model was used to evaluate the performance of companies and rank them according to their safety performance. By using these methods determines the leading companies in terms of best practices and provides information for government inspectors to investigate the priorities identified for inspection.


Keywords: Safety management system, factors impacts construction worksites, Fuzzy AHP and Fuzzy TOPSIS


Edition: Volume 7 Issue 4, April 2018,


Pages: 853 - 855


How to Download this Article?

You Need to Register Your Email Address Before You Can Download the Article PDF


How to Cite this Article?

Shamna P, Fazil P, "Study of Safety Management in Construction Industry", International Journal of Science and Research (IJSR), Volume 7 Issue 4, April 2018, pp. 853-855, https://www.ijsr.net/get_abstract.php?paper_id=ART20181710

Similar Articles with Keyword 'Safety management system'

Downloads: 125

Survey Paper, Civil Engineering, Iraq, Volume 6 Issue 4, April 2017

Pages: 2169 - 2175

Exploring the Reality of Implementing the Integrated Quality Management System for Construction Projects in Iraq

Angham Alsaffar | Israa Almaliki

Share this Article

Downloads: 184

Research Paper, Civil Engineering, Indonesia, Volume 7 Issue 12, December 2018

Pages: 417 - 422

Risk Management Maturity Safety and Health Management System (SMK3) Contractor-Case Study: Toll Road Project Bogor-Ciawi-Sukabumi

Susilawati [5] | Dr. Ir. Fitri Suryani MT [3] | Dr. Ir. Dwi Dinariana MT

Share this Article
Top