International Journal of Science and Research (IJSR)

International Journal of Science and Research (IJSR)
Call for Papers | Fully Refereed | Open Access | Double Blind Peer Reviewed

ISSN: 2319-7064


Downloads: 157 | Weekly Hits: ⮙1 | Monthly Hits: ⮙1

Research Paper | Civil Engineering | Iraq | Volume 7 Issue 1, January 2018


Optimal Responsibility in Causing of Delay for Construction Projects in Iraq by Using ANP Technique

Dr. Meervat R. Al-taie


Abstract: The construction projects suffer from the problem of delay in completion due to many factors that lead to slow implementation of time and quality required, in addition to the multiplicity parties involved and their effect in this delay, regardless to the type and nature of the construction project. The problem of delay is very large in Iraq because there are many different circumstances which have had negative effects on the economic situation of the country and on the deterioration of the services level required in time. The research sought to investigate the role of the parties involved in the implementation of the project to determine their responsibility in delaying the completion of the construction projects in Iraq and to know the roles and proportion of their responsibilities depending on the type and nature of the work provided by them in the implementation of the project through setting their priorities by using network analysis technique The final results show that the contractor, consultant and owner play an important role in the delay of the project with priority (38.52 %), (36.41 %) and (16.36 %) respectively. there are additional factors share with them in causing delay with priority equal to (8.71 %).


Keywords: Delay, Construction, Contractor, Cause, Consultant, Owner, ANP


Edition: Volume 7 Issue 1, January 2018,


Pages: 1666 - 1676


How to Download this Article?

You Need to Register Your Email Address Before You Can Download the Article PDF


How to Cite this Article?

Dr. Meervat R. Al-taie, "Optimal Responsibility in Causing of Delay for Construction Projects in Iraq by Using ANP Technique", International Journal of Science and Research (IJSR), Volume 7 Issue 1, January 2018, pp. 1666-1676, https://www.ijsr.net/get_abstract.php?paper_id=ART20179699

Similar Articles with Keyword 'Delay'

Downloads: 1 | Weekly Hits: ⮙1 | Monthly Hits: ⮙1

Analysis Study Research Paper, Civil Engineering, Libya, Volume 12 Issue 8, August 2023

Pages: 1114 - 1120

Evaluation of Construction Efficiency in the Implementation of the Construction Project in Libya

Fathi Elharare Elhaniash [2]

Share this Article

Downloads: 101

Case Studies, Civil Engineering, India, Volume 4 Issue 12, December 2015

Pages: 2069 - 2070

ISKON Rotary Intersection on S.G Highway in Ahmedabad as Signalized Intersection - A Case Study

Alpana Jha [3]

Share this Article
Top