International Journal of Science and Research (IJSR)

International Journal of Science and Research (IJSR)
Call for Papers | Fully Refereed | Open Access | Double Blind Peer Reviewed

ISSN: 2319-7064


Downloads: 150

Research Paper | Civil Engineering | Iraq | Volume 7 Issue 1, January 2018


Optimal Economic Design of Diversion Structures during Construction of a Dam by Particle Swarm Optimization

Dr. Basim H. Khudair | Raghad S. Mahmood | Noor S. Sadeq


Abstract: Diverting river flow during construction of a main dam involves the construction of cofferdams, and tunnels, channels or other temporary passages. Diversion channels are commonly used in wide valleys where the high flow makes tunnels or culverts uneconomic. The diversion works must form part of the overall project design since it will have a major impact on its cost, as well as on the design, construction program and overall cost of the permanent works. Construction costs contain of excavation, lining of the channel, and construction of upstream and downstream cofferdams. The optimization model was applied to obtain optimal channel cross section, height of upstream cofferdam, and height of downstream cofferdam with minimum construction costs for diversion works which is solved by PSO method using MATLAB. The optimization model was applied to prepare the optimal design graphs. It can be noticed, at any design flowrate, optimal water flow depth, bed width, and height of upstream and downstream cofferdams decrease with increase of the side-slope. Also, it can be observed, at any design flowrate, the construction cost increases with increase of the side-slope.


Keywords: Diversion channel, Optimization, PSO Algorithm, Optimal economic design, Dam construction


Edition: Volume 7 Issue 1, January 2018,


Pages: 959 - 964


How to Download this Article?

You Need to Register Your Email Address Before You Can Download the Article PDF


How to Cite this Article?

Dr. Basim H. Khudair, Raghad S. Mahmood, Noor S. Sadeq, "Optimal Economic Design of Diversion Structures during Construction of a Dam by Particle Swarm Optimization", International Journal of Science and Research (IJSR), Volume 7 Issue 1, January 2018, pp. 959-964, https://www.ijsr.net/get_abstract.php?paper_id=ART20179505

Similar Articles with Keyword 'Optimization'

Downloads: 1 | Weekly Hits: ⮙1 | Monthly Hits: ⮙1

Working Project, Civil Engineering, India, Volume 11 Issue 5, May 2022

Pages: 1771 - 1775

Optimization of Design Work-Flow of Land Development Project Using Multiple Software Integrations

Dr. A. R. Patil | Om Naik | Abhishek Pawar | Sujit Tikone

Share this Article

Downloads: 1 | Weekly Hits: ⮙1 | Monthly Hits: ⮙1

Research Paper, Civil Engineering, India, Volume 13 Issue 2, February 2024

Pages: 192 - 195

Utilization of Plastic Waste as a Partially Replacement of Course Aggregate in Concrete

Pravej Alam

Share this Article
Top