International Journal of Science and Research (IJSR)

International Journal of Science and Research (IJSR)
Call for Papers | Fully Refereed | Open Access | Double Blind Peer Reviewed

ISSN: 2319-7064


Downloads: 127

Research Paper | Civil Engineering | Iraq | Volume 6 Issue 7, July 2017


Estimation of Optimum Period of Time between Scheduled Maintenance in Iraqi Oil Refineries by using Operation Research Techniques

Ali Moosa Taqi | Sedqi Esmaeel Rezouki [2]


Abstract: Operations research is a powerful mathematical method available to managers to solve their administrative problems. Some methods of operational research can be applied in field of maintenance management, in other words, applying scientific methods to finding solutions to industrial problems, including maintenance work. The objective of this study to use the probability model to estimate the optimum period of scheduled preventive maintenance to give the manager the opportunity to choose the best maintenance time with the lowest cost. Microsoft Excel was used to build a special probability model to solve this problem and perform calculations. The probabilistic model to solve this problem was carried out in Najaf Oil Refinery (NOR) as a case study instead of other Iraqi oil refineries. The three production units were used in NOR for this purpose.


Keywords: Preventive maintenance, Corrective maintenance, Scheduled maintenance, Lost Production Cost


Edition: Volume 6 Issue 7, July 2017,


Pages: 1244 - 1249


How to Download this Article?

You Need to Register Your Email Address Before You Can Download the Article PDF


How to Cite this Article?

Ali Moosa Taqi, Sedqi Esmaeel Rezouki, "Estimation of Optimum Period of Time between Scheduled Maintenance in Iraqi Oil Refineries by using Operation Research Techniques", International Journal of Science and Research (IJSR), Volume 6 Issue 7, July 2017, pp. 1244-1249, https://www.ijsr.net/get_abstract.php?paper_id=ART20175538

Similar Articles with Keyword 'Preventive'

Downloads: 112

Review Papers, Civil Engineering, India, Volume 3 Issue 5, May 2014

Pages: 691 - 694

Complications During Multi-Level Basement / Deep Foundation Construction Projects

Jaspreet Singh [6] | V. Srinivasa Raghavan

Share this Article

Downloads: 113

Research Paper, Civil Engineering, India, Volume 7 Issue 9, September 2018

Pages: 945 - 947

Concrete Repair Systems: Field Performance of Pile Foundation

Dr. Mahipal Burdak

Share this Article
Top