International Journal of Science and Research (IJSR)

International Journal of Science and Research (IJSR)
Call for Papers | Fully Refereed | Open Access | Double Blind Peer Reviewed

ISSN: 2319-7064


Downloads: 124

Case Studies | Civil Engineering | India | Volume 5 Issue 7, July 2016


Integrated Traffic Planning of BRTS A case Study - Mr-10 road Indore

Gaurav Dane [3] | Ankita Goyal | H. S. Goliya


Abstract: Indore is a fast growing industrial city of Madhya Pradesh. To meet the large demand and improve the capacity and productivity of buses, ICTSL has proposed to plan, to develop and operate Bus Rapid Transit System (BRTS) in Indore. Bus Rapid Transit System is a new form of public transportation which is an emerging approach of using buses as an improved high-speed transit system. Bus Rapid Transit involves coordinated improvements in a transit systems infrastructure, equipment, operations, and technology that give preferential treatment to buses on urban roadways. We are selecting MR-10 Road corridor for our case study of integrated planning of BRTS. Now a days MR-10 area of Indore is developing rapidly. To provide faster and effective transit services, schedule is made for transit units going to be run on that route. The schedule is made for 14 hours in a day (700 AM To 09 PM) from Radisson Square to Aurobindo Square and vice versa. For finding out schedule of transit units, traffic data are collected at different road sections along the route. The traffic data is then analyzed and traffic flow and passenger flow along the route is taken out. Transit units are provided on the basis of passenger flow at different sections and at different time within a day. Reduction in air and noise pollution is calculated after planning of BRTS.


Keywords: BRTS, Scheduling, MR-10 Road, Traffic Data, Transit units


Edition: Volume 5 Issue 7, July 2016,


Pages: 1411 - 1417


How to Download this Article?

You Need to Register Your Email Address Before You Can Download the Article PDF


How to Cite this Article?

Gaurav Dane, Ankita Goyal, H. S. Goliya, "Integrated Traffic Planning of BRTS A case Study - Mr-10 road Indore", International Journal of Science and Research (IJSR), Volume 5 Issue 7, July 2016, pp. 1411-1417, https://www.ijsr.net/get_abstract.php?paper_id=ART2016511

Similar Articles with Keyword 'Scheduling'

Downloads: 0

Student Project, Civil Engineering, India, Volume 12 Issue 4, April 2023

Pages: 1579 - 1580

Cost and Time Saving Building Construction Using RC CAD Software

Rushabh Ranjeet Patil

Share this Article

Downloads: 7 | Weekly Hits: ⮙2 | Monthly Hits: ⮙2

Case Studies, Civil Engineering, India, Volume 11 Issue 4, April 2022

Pages: 1187 - 1197

A Case Study on Planning and Scheduling of a Project PIPLMC of a Package - 6A using Microsoft Project 2016

Kota Sai Krishna [2]

Share this Article
Top