Case Studies | Civil Engineering | India | Volume 4 Issue 5, May 2015

Resource Scheduling of Construction Project: Case Study

Rhuta Joshi, Prof. V. Z. Patil

Several construction activities can be managed to achieve the profit within limited funds and time. Thus project management techniques are useful in scheduling and coordinating the various resources by controlled method. Management techniques such as Critical Path Method, Program Evaluation and Review Techniques (CPM/PERT) have been successfully implemented prior to the 1970-s, in various Civil Engineering projects in the countries like USA, Canada, Australia. These techniques help management in efficient and economic use of resources for completion of project objectives with unlimited availability of resources, though it is observed that resources are limited in real project scenario. It has been observed that the project delays occur due to insufficient supply of resources. In large scale projects, preparing an accurate and workable plan is very difficult. Computer packages like MS Project and Primavera project planner are used in construction industry. Project management techniques can be used to resolve resource conflicts and also useful in minimizing the project duration within limited availability of resources to make the project profitable. The main aim of this study is to analyze the Project management techniques by scheduling various construction activities, allocation of resources and resource levelling using Microsoft Project 2013 for residential building. This paper analyzes resource constrained project using Microsoft Project 2013 by resource levelling and compares the time cost implications with scheduled time and estimated cost.

Keywords: Project management, Resource scheduling, Resource leveling, Microsoft Project

Edition: Volume 4 Issue 5, May 2015

Pages: 563 - 568

Share this Article

How to Cite this Article?

Rhuta Joshi, Prof. V. Z. Patil, "Resource Scheduling of Construction Project: Case Study", International Journal of Science and Research (IJSR), https://www.ijsr.net/search_index_results_paperid.php?id=SUB154213, Volume 4 Issue 5, May 2015, 563 - 568

56 PDF Views | 38 PDF Downloads

Download Article PDF

Similar Articles with Keyword 'Project management'

Research Paper, Civil Engineering, India, Volume 9 Issue 6, June 2020

Pages: 520 - 523

Construction Management Using Primavera

Fathima Zerin T, Angela C. Joy

Share this Article

M.Tech / M.E / PhD Thesis, Civil Engineering, India, Volume 6 Issue 6, June 2017

Pages: 2525 - 2528

A Study of Effective Scheduling Techniques for Improving the Profitability of Construction Firms

Sachin Mohan Kalel, Hemant Salunkhe

Share this Article

M.Tech / M.E / PhD Thesis, Civil Engineering, India, Volume 4 Issue 4, April 2015

Pages: 1942 - 1944

An Assessment of Factors Affecting the Accuracy of an Early Cost Estimate for Repetitive Projects

Parag R. Bhattad, Prof. Dr. R. K. Jain

Share this Article

Case Studies, Civil Engineering, India, Volume 4 Issue 5, May 2015

Pages: 563 - 568

Resource Scheduling of Construction Project: Case Study

Rhuta Joshi, Prof. V. Z. Patil

Share this Article

Research Paper, Civil Engineering, India, Volume 5 Issue 6, June 2016

Pages: 332 - 335

Multiple Resource Leveling using Re-Modified Minimum Moment Method to Construction Project

Lokendra Magendra, Sudhanshu Pathak

Share this Article

Similar Articles with Keyword 'Resource leveling'

Case Studies, Civil Engineering, India, Volume 4 Issue 5, May 2015

Pages: 563 - 568

Resource Scheduling of Construction Project: Case Study

Rhuta Joshi, Prof. V. Z. Patil

Share this Article

Research Paper, Civil Engineering, India, Volume 5 Issue 6, June 2016

Pages: 332 - 335

Multiple Resource Leveling using Re-Modified Minimum Moment Method to Construction Project

Lokendra Magendra, Sudhanshu Pathak

Share this Article

Similar Articles with Keyword 'Microsoft Project'

Case Studies, Civil Engineering, India, Volume 4 Issue 5, May 2015

Pages: 563 - 568

Resource Scheduling of Construction Project: Case Study

Rhuta Joshi, Prof. V. Z. Patil

Share this Article

Review Papers, Civil Engineering, India, Volume 8 Issue 4, April 2019

Pages: 1439 - 1445

Planning & Scheduling of Residential Building Using MS Project

S. T. Gavde, Kanase Swapnali, Mulani Apreen, Jadhav Varsha, Mane Mayuri

Share this Article

M.Tech / M.E / PhD Thesis, Civil Engineering, India, Volume 8 Issue 4, April 2019

Pages: 496 - 499

Effective Resource Utilization for Successful Completion of a Project in Nepal

Sudesh K.C., S. Priscil Nidhu

Share this Article



Top