International Journal of Science and Research (IJSR)

International Journal of Science and Research (IJSR)
www.ijsr.net | Most Trusted Research Journal Since Year 2012

ISSN: 2319-7064



Research Paper | Civil Engineering | India | Volume 9 Issue 6, June 2020

Construction Management Using Primavera

Fathima Zerin T, Angela C. Joy

Construction manager faces numbers of challenges, through which some are new to the construction industry and some are many years old. The construction problems like workforce consideration, safety, time constraints, and altering nature of work. For the successful completion of a project, planning and scheduling are two important factors. The demand of construction industry requires a precise planning, scheduling and management and resources. Due to the increase in workloads and shrinking re department found new technology which help management software is used as a tool for managing and organizing work which industries to grow in a rapid manner. There are so many computer softwares are available in market now a days which is such as MSP, Primavera p6, etcfor doing project management. With the help of these software proper planning and controlling of project can be done. Primavera can easily compare between the planned progress of construction work and actual progress of construction project. Project management software Primavera P6, include collecting, recording, monitoring, controlling, and reporting information concerning project performance. controlling and monitoring can be done, and the causes of delays can be found out.

Keywords: primavera, construction management

Edition: Volume 9 Issue 6, June 2020

Pages: 520 - 523


How to Cite this Article?

Fathima Zerin T, Angela C. Joy, "Construction Management Using Primavera", International Journal of Science and Research (IJSR), https://www.ijsr.net/search_index_results_paperid.php?id=SR20607214623, Volume 9 Issue 6, June 2020, 520 - 523

27 PDF Views | 26 PDF Downloads

Download Article PDF



Similar Articles with Keyword 'primavera'

Research Paper, Civil Engineering, India, Volume 9 Issue 6, June 2020

Pages: 520 - 523

Construction Management Using Primavera

Fathima Zerin T, Angela C. Joy

Share this article

Case Studies, Civil Engineering, India, Volume 4 Issue 5, May 2015

Pages: 563 - 568

Resource Scheduling of Construction Project: Case Study

Rhuta Joshi, Prof. V. Z. Patil

Share this article

Research Paper, Civil Engineering, India, Volume 6 Issue 3, March 2017

Pages: 658 - 662

Work Breakdown Structure Scheduling for Repetitive Construction Projects with Soft Logics

Lekshmi A L, Dr. T R Sethu Raman, Sreeja V

Share this article

Research Paper, Civil Engineering, India, Volume 4 Issue 8, August 2015

Pages: 422 - 425

Time and Cost Planning in Construction Project

Sandip Pawar, P. M. Attarde

Share this article

Research Paper, Civil Engineering, India, Volume 5 Issue 6, June 2016

Pages: 332 - 335

Multiple Resource Leveling using Re-Modified Minimum Moment Method to Construction Project

Lokendra Magendra, Sudhanshu Pathak

Share this article



Similar Articles with Keyword 'construction management'

Research Paper, Civil Engineering, India, Volume 9 Issue 6, June 2020

Pages: 520 - 523

Construction Management Using Primavera

Fathima Zerin T, Angela C. Joy

Share this article

M.Tech / M.E / PhD Thesis, Civil Engineering, India, Volume 5 Issue 4, April 2016

Pages: 1231 - 1237

Concept of Value Engineering in Construction Industry

Khaled Ali Alabd Ahmed, R. K. Pandey

Share this article

M.Tech / M.E / PhD Thesis, Civil Engineering, India, Volume 6 Issue 5, May 2017

Pages: 2349 - 2352

A Literature Review on Project Management System

Haseena V, Shaheer K

Share this article

M.Tech / M.E / PhD Thesis, Civil Engineering, India, Volume 7 Issue 4, April 2018

Pages: 215 - 216

Decision Making in Contractor Selection: AHP and Expert Choice Approach

Najla.M, Shajina

Share this article

M.Tech / M.E / PhD Thesis, Civil Engineering, India, Volume 4 Issue 5, May 2015

Pages: 324 - 329

Application of Building Information Modeling Tool for Building Project

Amol A. Metkari, Dr. A. C. Attar

Share this article
Top