International Journal of Science and Research (IJSR)

International Journal of Science and Research (IJSR)
www.ijsr.net | Most Trusted Research Journal Since Year 2012

ISSN: 2319-7064

M.Tech / M.E / PhD Thesis | Civil Engineering | India | Volume 9 Issue 5, May 2020

Construction Equipment Management in Project Site

Anagha Jaijith

Good project management in construction must vigorously pursue the efficient utilization of labour, material and equipment. The use of new equipment and innovative methods has made possible wholesale changes in construction technologies in recent decades. The selection of the appropriate type and size of construction equipment often affects the required amount of time and effort and thus the jobsite productivity of a project. It is therefore important for site managers and construction planners to be familiar with the characteristics of the major types of equipment most commonly used in construction. This thesis is to study the management of equipments practices in Construction Industry and to present the most popular practices of the contractors and to compare the equipment management policies with a Case study of a construction industry. The needed data were collected via a structured questionnaire. The collected data were analysed using SPSS Software. Finally, the findings of this study were compared with findings of questionnaire conducted for finding significant commonalities and differences in equipment management practices.

Keywords: Statistical package for the social sciences, SPSS, Construction Equipment

Edition: Volume 9 Issue 5, May 2020

Pages: 217 - 222


How to Cite this Article?

Anagha Jaijith, "Construction Equipment Management in Project Site", International Journal of Science and Research (IJSR), https://www.ijsr.net/search_index_results_paperid.php?id=SR20430161557, Volume 9 Issue 5, May 2020, 217 - 222

26 PDF Views | 29 PDF Downloads

Download Article PDF



Similar Articles with Keyword 'SPSS'

Research Paper, Civil Engineering, Nigeria, Volume 3 Issue 6, June 2014

Pages: 1557 - 1567

Model to Predict the Elastic Modulus of An A-5 Soil- Lime Mixture for Road Pavement Design in Rivers State Using one Indirect Tensile Testing Technique (Point Load)

D. B. Eme, J. C. Agunwamba

Share this article

Case Studies, Civil Engineering, India, Volume 5 Issue 2, February 2016

Pages: 134 - 136

Reducing Defects in RCC Member by using Six Sigma Principle

Neha Bagdiya, Sneha Sawant

Share this article

M.Tech / M.E / PhD Thesis, Civil Engineering, India, Volume 9 Issue 5, May 2020

Pages: 217 - 222

Construction Equipment Management in Project Site

Anagha Jaijith

Share this article

Similar Articles with Keyword 'Construction Equipment'

Review Papers, Civil Engineering, India, Volume 4 Issue 5, May 2015

Pages: 3003 - 3006

Construction Equipment Management for Construction of Dam Site

Kunal R Ghadge, Ashish B Ugale

Share this article

Research Paper, Civil Engineering, India, Volume 5 Issue 5, May 2016

Pages: 2266 - 2270

Cost Optimization of Earthwork Equipment Fleet by Productivity Analysis - Case Study of NH 50 Phase IV

Bhagyesh J. Chaudhari, Prof. S. C. Tandale, Prof. S. S. Deshmukh

Share this article

Research Paper, Civil Engineering, India, Volume 4 Issue 6, June 2015

Pages: 2558 - 2564

Construction Equipment Fleet Management: Case Study of Highway Construction Project

Saurabh Rajendra Kadam, Prof. Dhananjay S Patil

Share this article

M.Tech / M.E / PhD Thesis, Civil Engineering, India, Volume 5 Issue 12, December 2016

Pages: 1447 - 1450

Construction Equipment Monitoring and its Effect on Project Cost

A. N. Bhirud, V. D. Sakhare

Share this article

Research Paper, Civil Engineering, Iraq, Volume 6 Issue 9, September 2017

Pages: 177 - 182

Construction Equipment used in Highways Projects and the Risk of their Use on the Safety of Workers

Sedqi Esmaeel Rezouki

Share this article

Top