Causes and Effects of Variation Orders on Building Construction Projects in Kingdom of Bahrain
International Journal of Science and Research (IJSR)

International Journal of Science and Research (IJSR)
www.ijsr.net | Open Access | Fully Refereed | Peer Reviewed International Journal

ISSN: 2319-7064

Views: 58 , Downloads: 48 | CTR: 83 % | Weekly Popularity: ⮙3

Masters Thesis | Mechanical Engineering | Bahrain | Volume 10 Issue 1, January 2021

Causes and Effects of Variation Orders on Building Construction Projects in Kingdom of Bahrain

Noora Al mannai, Saad M. A.Suliman

Variation orders (VO) of construction projects lead to delay, increase in cost, quality defects and other negative effects. Through this research, we can study this dilemma throughout the Kingdom of Bahrain. The study identifies the most important reasons for variation orders in construction projects in the Kingdom of Bahrain. The study tried to clarify the effect of variation orders on the performance of these projects. The study depended on questionnaire and an interview survey. The population sample of this research consisted of clients, consultants and contractors of working construction companies involved in building construction projects in the Kingdom of Bahrain

Keywords: Variation orders, construction projects, schedule, cost overrun

Edition: Volume 10 Issue 1, January 2021

Pages: 1230 - 1237

Share this Article

How to Cite this Article?

Noora Al mannai, Saad M. A.Suliman, "Causes and Effects of Variation Orders on Building Construction Projects in Kingdom of Bahrain", International Journal of Science and Research (IJSR), https://www.ijsr.net/search_index_results_paperid.php?id=SR201108112857, Volume 10 Issue 1, January 2021, 1230 - 1237

58 PDF Views | 48 PDF Downloads

Download Article PDF



Similar Articles with Keyword 'schedule'

Views: 58 , Downloads: 48 | CTR: 83 % | Weekly Popularity: ⮙3

Masters Thesis, Mechanical Engineering, Bahrain, Volume 10 Issue 1, January 2021

Pages: 1230 - 1237

Causes and Effects of Variation Orders on Building Construction Projects in Kingdom of Bahrain

Noora Al mannai, Saad M. A.Suliman

Share this Article

Views: 131 , Downloads: 111 | CTR: 85 % | Weekly Popularity: ⮙1

Review Papers, Mechanical Engineering, India, Volume 5 Issue 4, April 2016

Pages: 1457 - 1461

A Review on Possible Increment of Heat Transfer Rate for Hydraulic Oil Used in Plastic Injection Moulding Machine

Sandip Kumar Das, Kedar Bhojak

Share this Article

Views: 130 , Downloads: 111 | CTR: 85 %

Review Papers, Mechanical Engineering, India, Volume 5 Issue 4, April 2016

Pages: 2266 - 2271

Oil Cooler Selection for Hydraulic System of Plastic Injection Moulding Machine: A Review

Sandip Kumar Das, Kedar Bhojak

Share this Article

Views: 126 , Downloads: 112 | CTR: 89 % | Weekly Popularity: ⮙1

Research Paper, Mechanical Engineering, India, Volume 3 Issue 9, September 2014

Pages: 1310 - 1313

Developing Fuzzy Scheduling System for Jobs Prioritization & Route Selection of Jobs in FMS

Sumit Chawla

Share this Article

Views: 153 , Downloads: 117 | CTR: 76 % | Weekly Popularity: ⮙1

Research Paper, Mechanical Engineering, India, Volume 7 Issue 6, June 2018

Pages: 1601 - 1608

Analysis and Modeling of Flexible Manufacturing System

Adarsh Kumar Pandey, Shiv Kumar Tripathi

Share this Article
Top