Multiple Resource Leveling using Re-Modified Minimum Moment Method to Construction Project
International Journal of Science and Research (IJSR)

International Journal of Science and Research (IJSR)
www.ijsr.net | Most Trusted Research Journal Since Year 2012

ISSN: 2319-7064



Research Paper | Civil Engineering | India | Volume 5 Issue 6, June 2016

Multiple Resource Leveling using Re-Modified Minimum Moment Method to Construction Project

Lokendra Magendra, Sudhanshu Pathak

A Project Manager frequently comes across two types of situations time constraints and resource constraints. A project requires resource to execute the activities. These resources include labor, equipment and materials required to complete the work. In the ideal world, resources are unlimited but in the real world they are generally not unlimited and the project team needs to level out the consumption of resource. The purpose of this paper is to apply Re-modified minimum moment method for multiple resource leveling to a construction project and resource leveling by using primavera project management software for the same project and to determine the optimum solution. The method is based on critical path method. To achieve the objective, data of construction of a residential tower is taken. It has been observed that Re-modification minimum moment gives optimum solution than primavera software.

Keywords: Resource rate, Resource Leveling, Re-Modified Minimum Moment Method, Primavera

Edition: Volume 5 Issue 6, June 2016

Pages: 332 - 335

Share this Article

How to Cite this Article?

Lokendra Magendra, Sudhanshu Pathak, "Multiple Resource Leveling using Re-Modified Minimum Moment Method to Construction Project", International Journal of Science and Research (IJSR), https://www.ijsr.net/search_index_results_paperid.php?id=NOV164011, Volume 5 Issue 6, June 2016, 332 - 335

56 PDF Views | 52 PDF Downloads

Download Article PDF



Similar Articles with Keyword 'Resource Leveling'

Research Paper, Civil Engineering, India, Volume 5 Issue 6, June 2016

Pages: 332 - 335

Multiple Resource Leveling using Re-Modified Minimum Moment Method to Construction Project

Lokendra Magendra, Sudhanshu Pathak

Share this Article

Case Studies, Civil Engineering, India, Volume 4 Issue 5, May 2015

Pages: 563 - 568

Resource Scheduling of Construction Project: Case Study

Rhuta Joshi, Prof. V. Z. Patil

Share this Article

Similar Articles with Keyword 'Primavera'

Research Paper, Civil Engineering, India, Volume 9 Issue 6, June 2020

Pages: 520 - 523

Construction Management Using Primavera

Fathima Zerin T, Angela C. Joy

Share this Article

Research Paper, Civil Engineering, India, Volume 4 Issue 8, August 2015

Pages: 422 - 425

Time and Cost Planning in Construction Project

Sandip Pawar, P. M. Attarde

Share this Article

Research Paper, Civil Engineering, India, Volume 5 Issue 6, June 2016

Pages: 332 - 335

Multiple Resource Leveling using Re-Modified Minimum Moment Method to Construction Project

Lokendra Magendra, Sudhanshu Pathak

Share this Article

Case Studies, Civil Engineering, India, Volume 4 Issue 5, May 2015

Pages: 563 - 568

Resource Scheduling of Construction Project: Case Study

Rhuta Joshi, Prof. V. Z. Patil

Share this Article

Research Paper, Civil Engineering, India, Volume 6 Issue 3, March 2017

Pages: 658 - 662

Work Breakdown Structure Scheduling for Repetitive Construction Projects with Soft Logics

Lekshmi A L, Dr. T R Sethu Raman, Sreeja V

Share this Article
Top