Monitoring and Controlling RCC Work in Construction Project

Nimesh Gujarati, Dr. B S Balapgol

Construction industry is always facing schedule delays and indirectly results in cost overruns. These two problems are the results of absence of better project monitoring and controlling system in a construction firm. Good monitoring and controlling system helps to forecast the project performance at any point in execution phase. Earned value management is one of the most effective project controlling and monitoring system which compares three cost performance indicators like budgeted cost of work done, budgeted cost of work scheduled and actual cost of work done. This study helps to forecast project performance periodically and propose solutions to minimize the schedule delays. Study focuses on projects where project completion in scheduled time is constraint.

Keywords: Crashing, Fast Tracking, Re-work, Tracking, Schedule Compression, Cost Slope, Schedule Variance, Cost Variance

Edition: Volume 5 Issue 5, May 2016

Pages: 2358 - 2362

Share this Article

How to Cite this Article?

Nimesh Gujarati, Dr. B S Balapgol, "Monitoring and Controlling RCC Work in Construction Project", International Journal of Science and Research (IJSR), https://www.ijsr.net/search_index_results_paperid.php?id=NOV163976, Volume 5 Issue 5, May 2016, 2358 - 2362

43 PDF Views | 38 PDF Downloads

Download Article PDF

Similar Articles with Keyword 'Crashing'

Research Paper, Civil Engineering, India, Volume 5 Issue 5, May 2016

Pages: 2358 - 2362

Monitoring and Controlling RCC Work in Construction Project

Nimesh Gujarati, Dr. B S Balapgol

Share this Article

Research Paper, Civil Engineering, India, Volume 4 Issue 8, August 2015

Pages: 422 - 425

Time and Cost Planning in Construction Project

Sandip Pawar, P. M. Attarde

Share this Article

Research Paper, Civil Engineering, India, Volume 7 Issue 10, October 2018

Pages: 515 - 519

Material Constrained Scheduling in Construction Project

M. P. Venkatesh, Saravana Natarajan P.S

Share this Article

Similar Articles with Keyword 'Tracking'

Research Paper, Civil Engineering, India, Volume 5 Issue 5, May 2016

Pages: 2358 - 2362

Monitoring and Controlling RCC Work in Construction Project

Nimesh Gujarati, Dr. B S Balapgol

Share this Article

Research Paper, Civil Engineering, India, Volume 4 Issue 8, August 2015

Pages: 422 - 425

Time and Cost Planning in Construction Project

Sandip Pawar, P. M. Attarde

Share this Article



Top