An Assessment of the Factors Causing Delays on Residential Construction Projects in Pune

Sneha K. Pawar, S. S.Ambure

Residential building construction projects in Pune construction industry are experiencing a wide spread of delays. The purpose of this study was to assess the factors causing delays and their effects on building construction projects in Pune. Thirty Two (32) project delay attributes were identified through detailed literature review. Structured interviews and questionnaire survey were conducted across stakeholders. This research categorized the causes of delay under three main groups of consultant related, contractor related and client related. The RII technique for all delay factors and group of categories was computed so as to rank the factors. The most significant factors of construction delays were identified as (1) Shortage of materials, (2) Obtaining permit from municipality, (3) Late deliveries of materials, (4) Legal disputes, (5) Shortage of skilled labors. The study concluded that contractor related category had the highest impact (RII 0.96), followed by consultant related (RII = 0.94), then client related (RII = 0.93). Identification of the causes of potential delay factors that are likely to affect the timely delivery of projects can help to avoid extra costs through claims and disputes that arise among parties when delays are experienced.

Keywords: Delays, Relative Importance Index RII, effects of delays

Edition: Volume 6 Issue 6, June 2017

Pages: 2319 - 2323


How to Cite this Article?

Sneha K. Pawar, S. S.Ambure, "An Assessment of the Factors Causing Delays on Residential Construction Projects in Pune", International Journal of Science and Research (IJSR), https://www.ijsr.net/search_index_results_paperid.php?id=ART20174826, Volume 6 Issue 6, June 2017, 2319 - 2323

27 PDF Views | 22 PDF Downloads

Download Article PDF



Similar Articles with Keyword 'Delays'

Research Paper, Civil Engineering, India, Volume 9 Issue 6, June 2020

Pages: 520 - 523

Construction Management Using Primavera

Fathima Zerin T, Angela C. Joy

Share this article

Review Papers, Civil Engineering, India, Volume 6 Issue 6, June 2017

Pages: 2319 - 2323

An Assessment of the Factors Causing Delays on Residential Construction Projects in Pune

Sneha K. Pawar, S. S.Ambure

Share this article

M.Tech / M.E / PhD Thesis, Civil Engineering, India, Volume 4 Issue 8, August 2015

Pages: 1027 - 1035

Efficient Contractor Selection and Bid Evaluation Methods for Construction Industry in India

Dwarika Puri, Dr. Sanjay Tiwari

Share this article

Research Paper, Civil Engineering, India, Volume 5 Issue 5, May 2016

Pages: 2358 - 2362

Monitoring and Controlling RCC Work in Construction Project

Nimesh Gujarati, Dr. B S Balapgol

Share this article

Case Studies, Civil Engineering, India, Volume 4 Issue 5, May 2015

Pages: 563 - 568

Resource Scheduling of Construction Project: Case Study

Rhuta Joshi, Prof. V. Z. Patil

Share this article



Similar Articles with Keyword 'Relative Importance Index RII'

Review Papers, Civil Engineering, India, Volume 6 Issue 6, June 2017

Pages: 2319 - 2323

An Assessment of the Factors Causing Delays on Residential Construction Projects in Pune

Sneha K. Pawar, S. S.Ambure

Share this article

Research Paper, Civil Engineering, India, Volume 4 Issue 5, May 2015

Pages: 1585 - 1588

Identifying Factors Affecting Construction Labour Productivity in Amravati

Anurag Sangole, Amit Ranit

Share this article
Top