International Journal of Science and Research (IJSR)

International Journal of Science and Research (IJSR)
www.ijsr.net | Most Trusted Research Journal Since Year 2012

ISSN: 2319-7064



Case Studies | Financial Engineering | Indonesia | Volume 6 Issue 3, March 2017

Capital Structure Optimization of Staging Development Toll Road Project in Indonesia

Gibranius Berutu, Muhammad Firdaus, Hendro Sasongko

The characteristics of toll road project investment are lengthy payback and high upfront capital requirements, therefore, its funded with mixed debt-equity capital. The government Indonesia was invite investors to participate road infrastructure development, nevertheless financial viability of investment packages were not interesting enough for certain number of promoted projects. Staged development divided road into segments and it should be an alternative to generate traffic demand for assign minimum viability threshold. Each segment constructing schedule should not delayed to avoid cost escalation that borne to the next development. On-time construction start highly depend on traffic demand projection accuracy. The last constructed segment, would have shortest independent concession. Government own the authority to determine initial tariff and its adjustment, therefore, investors have no power to set price. Both internal and external condition of the industry must thoroughly examined because there was a time arrangement for staging investment. Optimal capital structure analysis was done to calculate minimum equity level and maximize profitability. Either interest rate or equity cost were modeled as the function of DER, where exact solution found by a trial-error approach. Simulation output was reveal that late start of construction schedule would escalate the investment cost and decrease viability of project.

Keywords: DER, optimum capital structure, toll road project

Edition: Volume 6 Issue 3, March 2017

Pages: 955 - 961

Share this Article

How to Cite this Article?

Gibranius Berutu, Muhammad Firdaus, Hendro Sasongko, "Capital Structure Optimization of Staging Development Toll Road Project in Indonesia", International Journal of Science and Research (IJSR), https://www.ijsr.net/search_index_results_paperid.php?id=ART20171673, Volume 6 Issue 3, March 2017, 955 - 961

66 PDF Views | 53 PDF Downloads

Download Article PDF

Similar Articles with Keyword 'DER'

Research Paper, Financial Engineering, Switzerland, Volume 3 Issue 11, November 2014

Pages: 1456 - 1472

On Single and Multiple Currency Multifactor LIBOR Market Models: Application to Currency Options

Werner Hrlimann

Share this Article

Research Paper, Financial Engineering, Kenya, Volume 4 Issue 2, February 2015

Pages: 1851 - 1861

The Determinants of Dividend Smoothing among Listed Companies at the Nairobi Securities Exchange

Abala P. Otieno, Magadi S. Oloo

Share this Article

Research Paper, Financial Engineering, Kenya, Volume 3 Issue 4, April 2014

Pages: 495 - 498

Access to Credit Facilities as a Major Factor Hindering Access to Public Procurement Contracts by Youth Entrepreneurs in Government Ministries in Ol Kalou Sub-County, Kenya

Ezekiel Ngigi Kamau, Daniel Wanyoike, Benson Mwangi

Share this Article

Research Paper, Financial Engineering, India, Volume 3 Issue 8, August 2014

Pages: 1557 - 1563

Turnover Tax and Stock Return Volatility: Recent Experiments from Asia Countries

Farzaneh Haghighatnia, Hossein Niavand

Share this Article

Research Paper, Financial Engineering, Kenya, Volume 3 Issue 7, July 2014

Pages: 909 - 914

The Dynamics of Behavioral Finance: A Plus for Professional Investment Practitioners?

Moses Odongo Otieno, Samuel Mwangi Miano

Share this Article



Top