Efforts in Improving Overall Equipment Effectiveness (OEE) of Weaving Machine in Tire Cord Division at Tire Manufacturing Company in Indonesia
International Journal of Science and Research (IJSR)

International Journal of Science and Research (IJSR)
www.ijsr.net | Most Trusted Research Journal Since Year 2012

ISSN: 2319-7064



Case Studies | Industrial Engineering | Indonesia | Volume 5 Issue 7, July 2016

Efforts in Improving Overall Equipment Effectiveness (OEE) of Weaving Machine in Tire Cord Division at Tire Manufacturing Company in Indonesia

Akhmad Fauzi, Gimbal Doloksaribu

Weaving is one part of the production department at a manufacturing company in Indonesia that operates in the process of tire cord making, which cannot evade from problems relating to the machine effectiveness caused by the Six Big Losses. Therefore, effective and efficient measures are needed in machine maintenance to overcome and prevent the mentioned problems. The aim of this research is to investigate what the value of the effectiveness of the weaving machine is, to conduct statistical analyses to determine the most dominating factors affecting the inefficiency, and to obtain solutions for improvement based on Total Productive Maintenance (TPM). This research used the measuring method Overall Equipment Effectiveness (OEE), the analysis of the calculation of the Six Big Losses, and the Cause and Effect diagram to find existing problems and to offer suggestions to fix the problems. The results of this research show that the average OEE of the weaving machine was 71.7 % with the availability rate of 86.3 %, performance efficiency of 83.6 %, and quality rate of 99.1 %. The most dominating factor influencing the low effectiveness of the Weaving was reduced speed losses, the suggested corrective action is to implement autonomous maintenance in accordance with TPM.

Keywords: Weaving, Tire cord, Total Productive Maintenance, Overall Equipment Effectiveness, Six Big Losses

Edition: Volume 5 Issue 7, July 2016

Pages: 730 - 735

Share this Article

How to Cite this Article?

Akhmad Fauzi, Gimbal Doloksaribu, "Efforts in Improving Overall Equipment Effectiveness (OEE) of Weaving Machine in Tire Cord Division at Tire Manufacturing Company in Indonesia", International Journal of Science and Research (IJSR), https://www.ijsr.net/search_index_results_paperid.php?id=ART2016203, Volume 5 Issue 7, July 2016, 730 - 735

83 PDF Views | 53 PDF Downloads

Download Article PDF



Similar Articles with Keyword 'Total Productive Maintenance'

Case Studies, Industrial Engineering, Indonesia, Volume 5 Issue 7, July 2016

Pages: 730 - 735

Efforts in Improving Overall Equipment Effectiveness (OEE) of Weaving Machine in Tire Cord Division at Tire Manufacturing Company in Indonesia

Akhmad Fauzi, Gimbal Doloksaribu

Share this Article

Case Studies, Industrial Engineering, Indonesia, Volume 5 Issue 7, July 2016

Pages: 736 - 739

Improving Productivity Based on Evaluation Score of Overall Equipment Effectiveness (OEE) Using DMAIC Approach on Blistering Machine

Mohamad Sukma Hervian, Chandrasa Soekardi

Share this Article

Research Paper, Industrial Engineering, India, Volume 7 Issue 1, January 2018

Pages: 385 - 389

Implementation of Total Productive Maintenance for Reducing Losses and Improving Productivity of Slotting and Honing Machine

Thorat Swapnil V, Patil Rajkumar

Share this Article

Similar Articles with Keyword 'Overall Equipment Effectiveness'

Case Studies, Industrial Engineering, Indonesia, Volume 5 Issue 7, July 2016

Pages: 730 - 735

Efforts in Improving Overall Equipment Effectiveness (OEE) of Weaving Machine in Tire Cord Division at Tire Manufacturing Company in Indonesia

Akhmad Fauzi, Gimbal Doloksaribu

Share this Article

Case Studies, Industrial Engineering, Indonesia, Volume 5 Issue 7, July 2016

Pages: 736 - 739

Improving Productivity Based on Evaluation Score of Overall Equipment Effectiveness (OEE) Using DMAIC Approach on Blistering Machine

Mohamad Sukma Hervian, Chandrasa Soekardi

Share this Article

Research Paper, Industrial Engineering, India, Volume 7 Issue 1, January 2018

Pages: 385 - 389

Implementation of Total Productive Maintenance for Reducing Losses and Improving Productivity of Slotting and Honing Machine

Thorat Swapnil V, Patil Rajkumar

Share this Article

Similar Articles with Keyword 'Six Big Losses'

Case Studies, Industrial Engineering, Indonesia, Volume 5 Issue 7, July 2016

Pages: 730 - 735

Efforts in Improving Overall Equipment Effectiveness (OEE) of Weaving Machine in Tire Cord Division at Tire Manufacturing Company in Indonesia

Akhmad Fauzi, Gimbal Doloksaribu

Share this Article

Case Studies, Industrial Engineering, Indonesia, Volume 5 Issue 7, July 2016

Pages: 736 - 739

Improving Productivity Based on Evaluation Score of Overall Equipment Effectiveness (OEE) Using DMAIC Approach on Blistering Machine

Mohamad Sukma Hervian, Chandrasa Soekardi

Share this Article
Top