Abstract: Study of Infrastructure Financing with the Using Wealth Alms In The Province of South Sulawesi (Case Study Road Development Mustafa Dg. Bunga - Muttalib Dg. Narang South Sulawesi Province)
International Journal of Science and Research (IJSR)

International Journal of Science and Research (IJSR)
Open Access | Fully Refereed | Peer Reviewed

ISSN: 2319-7064

Downloads: 110

Research Paper | Civil Engineering | Indonesia | Volume 5 Issue 8, August 2016

Study of Infrastructure Financing with the Using Wealth Alms In The Province of South Sulawesi (Case Study Road Development Mustafa Dg. Bunga - Muttalib Dg. Narang South Sulawesi Province)

Mursalim, Sakti Adji Adisasmita, Rusdi Usman Latif, Suharman Hamzah

ased on data from the Directorate General of Budget, Ministry of Finance during 2005-2010 the average state budget has sucked for personnel expenditure expenditure (1217 %), transfers to the regions (31.68 %) and payments of principal and interest on the debt (1059 %). With the constitutional mandate of the education and health budgets would in turn make the fiscal burden of the government in implementing development. According to the Secretary General of the Ministry of Public Works at the Working Meeting Scope of Public Works in South Sulawesi (Makassar 21 November 2013), asserts that in order to achieve economic growth of 5 %, required Infrastructure Fund 5 % Gross Regional Domestic Product (GDP), or equivalent to Rp.2.100 trillion for the period 2010-2014, while the government is only able to prepare Infrastructure Fund Rp.836 Trillion. Wealth Alms Potential within the scope of South Sulawesi Province according to the results Summary of Board of National Alms South Sulawesi province in 2015, amounts to approximately Rp.3.255.000.000, -. This represents a huge potential as an alternative financing infrastructure in the province of South Sulawesi, in addition alternative to State Budget, Local Government Budget or Foreign Aid Funds. Financing of road infrastructure worth Rp.4.499.808.000, - with tithe, takes only 1 (one) year, however, loan installment (Tithe Funds) after the road operational (assumed to road users able to pay road rates) or Ability To Pay, the Installment of the loan (Return of Investment) only takes two (2) years.

Keywords: Financing, Infrastructure, Wealth alms and National Alms Board

Edition: Volume 5 Issue 8, August 2016

Pages: 1928 - 1938

Share this Article

How to Cite this Article?

Mursalim, Sakti Adji Adisasmita, Rusdi Usman Latif, Suharman Hamzah, "Study of Infrastructure Financing with the Using Wealth Alms In The Province of South Sulawesi (Case Study Road Development Mustafa Dg. Bunga - Muttalib Dg. Narang South Sulawesi Province)", International Journal of Science and Research (IJSR), https://www.ijsr.net/search_index_results_paperid.php?id=ART20161317, Volume 5 Issue 8, August 2016, 1928 - 1938

Enter Your Email Address


Similar Articles with Keyword 'Financing'

Downloads: 97

M.Tech / M.E / PhD Thesis, Civil Engineering, Indonesia, Volume 9 Issue 7, July 2020

Pages: 476 - 481

Financing Projects of Road Improvement Special Economic Areas Tanjung Lesung Banten with the SBSN Scheme (Surat Berharga Syariah Negara). Case Study: Preservation and Widening of the Road to Pasauran Section - Sp Labuhan - Cibaliung and Citeureup - Tanjung Lesung

Heriyanto, Dr. Ir. Hari Nugraha Nurjaman MT, Dr. Ir. Fitri Suryani MT

Share this Article

Downloads: 258

M.Tech / M.E / PhD Thesis, Civil Engineering, Indonesia, Volume 9 Issue 1, January 2020

Pages: 194 - 204

Public Private Partnership (PPP) with the Availability Payment Scheme in the Development of North Circle Road of Cilegon City

Rohimat ST

Share this Article

Similar Articles with Keyword 'Infrastructure'

Downloads: 5 | Weekly Hits: ⮙1 | Monthly Hits: ⮙1

Survey Paper, Civil Engineering, India, Volume 10 Issue 5, May 2021

Pages: 1285 - 1290

To Minimize Construction Cost and Time of Panvel-Karjat Suburban Corridor (Under MUTP-3A) by Implementation of Value Engineering Aspect

Rushabh. N. Jain

Share this Article

Downloads: 39

Research Paper, Civil Engineering, Indonesia, Volume 10 Issue 2, February 2021

Pages: 935 - 942

Risk Analysis of Time in Building Development Viewed from the Contractors Side in Jayapura

Dewi Ana Rusim, Antas H. Sinaga, Harmonis Rante

Share this Article
Top